Infrastructure Consulting provided engineering design and construction support services for the installation of a new exhaust stack at Pelican Point Power Station.
The project involved complex construction sequencing, heavy lifting operations, and foundation strengthening works within a live power generation environment, all delivered under a tight programme.
Infrastructure Consulting’s scope included:
Our team worked closely with the construction team to provide practical, buildable engineering solutions, addressing temporary and permanent load cases, staged construction conditions, and site access constraints. Rapid engineering input during critical phases of the works enabled safe execution of major lifts and successful installation of the new structure.
This project demonstrates Infrastructure Consulting’s strength in construction-stage engineering, where technical rigour is combined with on-site practicality to support complex industrial installations.
At Infrastructure Consulting, we understand that every engineering and civil project is unique, with its own set of challenges and objectives. Our team is here to support you every step of the way.